Egan Drive Improvements
  • About the Project
  • Project Design
  • Contact Us
  • FAQs
  • About the Project
  • Project Design
  • Contact Us
  • FAQs

egan drive improvements
​​
​main street to 10th street
​

5/28/20 Project Update

5/28/2020

 
​While work continues between Whittier Street and 10th Street, Secon and the DOT&PF will be opening a new work zone in front of the Merchant’s Wharf beginning Monday, June 1. This work will require shutting down the Main Street traffic signal. Once the signal is non-operational, left-turns at Main Street will be restricted.  
  • Initially the Main Street signal will be in “flashing mode” indicating motorists traveling inbound and outbound on Egan to use caution, and motorists on Main Street to stop and then proceed with caution through the intersection.
  • Once traffic control devices are in place, the signal will be non-operational through September.  
  • Willoughby Avenue access will be reopened for right turns off-of and on-to Egan Drive.
  • Traffic controls will be in place on Egan between 12th Street and Seward Street, reducing traffic lanes to one lane in each direction.
  • Left turns will be restricted on-to or off-of Egan Drive after 10th Street to Ferry Way to ensure the best possible flow of traffic through the work zone.
  • Pedestrian access will be maintained on the mountainside of Egan between Seward and Whittier Street, and on the waterside of Egan between Whittier and 10th Street.
  • Pedestrian crossings will be available at Ferry Way, Whittier Street, and 10th Street.
Picture
The safety of the traveling public and our workers is our main concern. 
Please follow designated traffic revisions, posted pedestrian routes,
​and never enter a work zone.


Comments are closed.

      Sign up for email updates

    Submit

    RSS Feed